11 off the grid apartments in Amsterdam

The challenge

As a condition for the construction of an apartment complex on the Bilderdijkkade in Amsterdam, the municipality has laid down a solid package of requirements for the heating installation. Gasless / All-electric heating without an open or closed source due to the limited space underground and the already existing heat storage system of the Hallen behind it. Air-water heat pumps are not desirable because of the expected noise nuisance in the courtyard. That suits us well.

 

The solution

Triple Solar, together with H2O Installatietechniek from Woerden, delivered an installation with a Nibe 28 kW heat pump with 100 PVT heat pump solar panels. Gasless heating and hot tap water. The installation has been extended with a cooling module that also kept the building pleasantly warm throughout the summer. The installation is compactly placed on the roof.

Delen via

Vergelijkbare berichten

  • jan

    17

    2023

    Triple Solar haalt 10 miljoen euro groeikapitaal op

    Triple Solar, uitvinder van de PVT-warmtepomp en bijbehorende PVT-warmtepomppanelen, heeft met pensioenfonds ABP een belangrijke [...]

  • nov

    29

    2022

    Triple Solar PVT-warmtepomp krijgt ISDE-subsidie toegekend

    De Investeringssubsidie Duurzame Energie en Energiebesparing (ISDE) is vanaf nu van toepassing op de Triple Solar PVT-warmtepomp [...]

  • nov

    22

    2022

    Uit de schaduw van de salderingsregeling stappen

    De voorgenomen afbouw van de salderingsregeling werpt z’n schaduw vooruit. Veel mensen vragen zich af [...]

  • sep

    22

    2022

    PVT zit in de lift

    Elektriciteit en warmte opwekken met één paneel, dat is de kracht van PVT. In de [...]