11 off the grid apartments in Amsterdam

The challenge

As a condition for the construction of an apartment complex on the Bilderdijkkade in Amsterdam, the municipality has laid down a solid package of requirements for the heating installation. Gasless / All-electric heating without an open or closed source due to the limited space underground and the already existing heat storage system of the Hallen behind it. Air-water heat pumps are not desirable because of the expected noise nuisance in the courtyard. That suits us well.

 

The solution

Triple Solar, together with H2O Installatietechniek from Woerden, delivered an installation with a Nibe 28 kW heat pump with 100 PVT heat pump solar panels. Gasless heating and hot tap water. The installation has been extended with a cooling module that also kept the building pleasantly warm throughout the summer. The installation is compactly placed on the roof.

Delen via

Vergelijkbare berichten

  • feb

    23

    2023

    TRIPLE SOLAR lanceert PVT-warmtepomp op de Duitse markt

    Triple Solar lanceert PVT-warmtepomp op de Duitse markt Tijdens de ISH beurs in Frankfurt lanceert [...]

  • feb

    21

    2023

    PVT-panelen op voormalig NRC-gebouw

    Duurzame energiecentrale op voormalig NRC-gebouw met PVT-panelen Met het plaatsen van een duurzame energiecentrale op [...]

  • jan

    31

    2023

    Review Triple Solar PVT systeem

    Review Triple Solar PVT systeem: René Oosterom deel zijn verhaal en ervaringen in 2022 René [...]

  • jan

    24

    2023

    Van ‘Verder zonder gas’ naar ‘impact maken’

    Van ‘Verder zonder gas’ naar ‘impact maken’ Niet vies van een flinke dosis ambitie werd [...]