11 off the grid apartments in Amsterdam

The challenge

As a condition for the construction of an apartment complex on the Bilderdijkkade in Amsterdam, the municipality has laid down a solid package of requirements for the heating installation. Gasless / All-electric heating without an open or closed source due to the limited space underground and the already existing heat storage system of the Hallen behind it. Air-water heat pumps are not desirable because of the expected noise nuisance in the courtyard. That suits us well.

 

The solution

Triple Solar, together with H2O Installatietechniek from Woerden, delivered an installation with a Nibe 28 kW heat pump with 100 PVT heat pump solar panels. Gasless heating and hot tap water. The installation has been extended with a cooling module that also kept the building pleasantly warm throughout the summer. The installation is compactly placed on the roof.

Delen via

Vergelijkbare berichten

  • okt

    29

    2024

    In Veldhoven experimenteert woningcorporatie Woonbedrijf met warmte uit de zon

    In Nederland bestaat ongeveer 30% van de woningen uit sociale huurwoningen. Woningcorporaties staan voor de [...]

  • okt

    15

    2024

    Triple Solar introduceert de nieuwe PVT-warmtepomp 5

    Ontwikkelaar en producent van het Triple Solar PVT-warmtepomppaneel introduceert de nieuwe PVT-warmtepomp 5. De warmtepomp [...]

  • aug

    26

    2024

    Is mijn huis geschikt voor een PVT-warmtepomp?

    Wil je weten of jouw huis geschikt is voor een PVT-warmtepomp? Maar twijfel je of [...]

  • mei

    14

    2024

    Triple Solar introduceert het oranjerode PVT-paneel ‘Terracotta’

    Triple Solar introduceert het oranjerode PVT-paneel ‘Terracotta’ Ontwikkelaar en producent van het Triple Solar warmtepomppaneel [...]