11 off the grid apartments in Amsterdam

The challenge

As a condition for the construction of an apartment complex on the Bilderdijkkade in Amsterdam, the municipality has laid down a solid package of requirements for the heating installation. Gasless / All-electric heating without an open or closed source due to the limited space underground and the already existing heat storage system of the Hallen behind it. Air-water heat pumps are not desirable because of the expected noise nuisance in the courtyard. That suits us well.

 

The solution

Triple Solar, together with H2O Installatietechniek from Woerden, delivered an installation with a Nibe 28 kW heat pump with 100 PVT heat pump solar panels. Gasless heating and hot tap water. The installation has been extended with a cooling module that also kept the building pleasantly warm throughout the summer. The installation is compactly placed on the roof.

Delen via

Vergelijkbare berichten

  • dec

    23

    2024

    ISDE-subsidie voor water/water-warmtepompen blijft in 2025 gelijk

      ISDE-subsidie voor water/water-warmtepompen blijft in 2025 gelijk Ook in 2025 blijft de overheid verduurzaming [...]

  • dec

    18

    2024

    Hoe Frans en Bert er met de Kerst warm bij zitten dankzij Triple Solar

    Wij gingen langs bij Frans en Bert, twee buurmannen die wilden overstappen op duurzaam verwarmen. Toen [...]

  • dec

    12

    2024

    Ik heb al zonnepanelen, dus ik kan geen PVT-systeem meer plaatsen

    Dat horen we regelmatig. Mensen die dit zeggen, veronderstellen vaak dat er een groot aantal [...]

  • dec

    10

    2024

    Slim besparen en duurzaam wonen: Nieuwe energieoplossingen voor sociale huurders

    Met de afbouw van de salderingsregeling in zicht wordt het steeds belangrijker om alternatieve oplossingen [...]