The challenge

Schouten Techniek, the main installer of the new-build complex, has asked us to think about how to balance and regenerate the ATES (Heat Cold Storage) in the future. The roof surface was already fully planned with ventilation pipes, aeration and fall protection.

The solution

The Triple Solar energy roof was fitted into the existing roof design with great care. The available amount of m2 required a maximum yield per m2. Fall protection has been confirmed on the Triple Solar panels. The 700 m2 installed provides the heat required for balancing the ATES.